Shenzhen-Zhongshan Link begins trial operation today

GDToday

On the morning of June 30, the opening ceremony of the Shenzhen-Zhongshan Link was held on the west artificial island of the Link. At around 10:50 a.m., the Link was officially opened.

The Shenzhen-Zhongshan Link, which runs across the estuary of the Pearl River, will begin trial operation at 3pm today, further promoting the integrated development of the Guangdong-Hong Kong-Macao Greater Bay Area (GBA).

The 24-km-long cross-sea link is a core transportation hub project in the GBA. It consists of one underwater tunnel, two bridges and two artificial islands, standing as one of the most challenging cross-sea project clusters in the world.

Now the travel time between Shenzhen and Zhongshan has been reduced from the previous two hours to approximately 30 minutes.

Poster | Ou Xiaoming, Lulu

Editor | Olivia, Monica

编辑 邓苇
+1
您已点过

订阅后可查看全文(剩余80%)

更多精彩内容请进入频道查看

还没看够?打开南方+看看吧
立即打开